Connection Of The Air Duct; Connection Of The Unit To Electric Network; Start-Up Recommendations; System Protection - Salda RIRS H EKO 3.0 Mounting And Installation Instruction

Table of Contents

Advertisement

5.6.

CONNECTION OF THE AIR DUCT

and noise level, you can increase the diameter.
• In order to reduce the level of the noise in the air supply system, install dampers (see the chapter on air supply system installation).
• External air and exhaust system piping should be isolated in order to prevent heat loss and condensation.
• When installing air ducts next to the ventilation equipment, brackets must be used. They suppress vibration and assure secure installation of the
• Air ducts are often mistakenly connected in inappropriate location. The ventilation units bear the labels indicating the correct air duct connection
5.7.

CONNECTION OF THE UNIT TO ELECTRIC NETWORK

• The unit must be earthed according to electrical equipment installation regulation.
made during transportation.
The manufacturer does not assume any liability for personal injuries and property damage due to non-conformance with the
provided instructions.
5.8.

START-UP RECOMMENDATIONS

5.8.1. SYSTEM PROTECTION

RIRS EKO 3.0
F1
F2
RIRS EKO 3.0
Mains Fuse
RIRS 400-700 H EKO 3.0 v2023.2
Figure 5.5.2.1. Floor mounting
"DIMENSIONS AND WEIGHT".
400 HE
400 HW
10 A
5 A
6,3 A
1 A
400 HE
400 HW
10 A
6 A
500 HE
500 HW
10 A
5 A
6,3 A
1 A
500 HE
500 HW
10 A
6 A
700 HE
700 HW
15 A
10 A
10 A
1 A
700 HE
700 HW
16 A
6A
EN |
11
-
-

Advertisement

Table of Contents
loading

Table of Contents