Operation
9
Operation
9.1
Installation inspection
The following points must be checked to ensure correct installation:
Correct power supply connections and fuses.
•
Complete and correct mechanical and electrical installation.
•
Check that the mechanical and electrical installation is complete and correct Input voltages.
•
Checking the purity of the optical components (free of dust and dirt).
•
Remove the protective cover from the focusing lens.
•
Check the environmental conditions against the technical specification.
•
Observe laser safety regulations.
•
Check compliance with all laser safety measures. The system may only be switched on if all precautions have been
•
taken to comply with the laser safety have been checked. by an authorized person and found to comply with the
standards.
9.2
Marking soware
The marking soware is included on an accompanying data medium.
For information on using the soware, please read the accompanying soware manual.
48