Setup Procedure Before Starting Operation - Mitsubishi Electric MELSEC-FX3S Series Manual

Table of Contents

Advertisement

FX
/FX
/FX
/FX
/FX
3S
3G
3GC
3U
FX
-4AD-PTW-ADP (4-channel Platinum Resistance Thermometer Data Input)
3U
1.2

Setup Procedure Before Starting Operation

Before starting analog input using the PTW-ADP, follow the procedure below to set up the system:
FX
Specifications check
System configuration and selection
If the error status data or the input digital value is
abnormal, refer to Chapter 5 "Troubleshooting."
J-4
PLC User's Manual - Analog Control Edition
3UC
-4AD-PTW-ADP
3U
Refer to Chapter 1.
Outline
Refer to Chapter 2.
Refer to the common
Refer to Chapter 3.
Wiring
Refer to Chapter 4.
Programming
Outline of system:
•Compatible PLC version number
•Compatible programming tool version
number
Specifications:
•Operation environment
•Performance specifications
•Input characteristics
pages.
System configuration:
(Refer to the common pages for analog
control.)
•Selection of units
Wiring:
•Power supply line
•Platinum resistance thermometer
sensor line
Programming:
•Details of special devices
•Examples of basic programs
1.2 Setup Procedure Before Starting Operation
1 Outline

Advertisement

Table of Contents
loading

Table of Contents