Operation; Button Operation; Screen Description - PROLiNK Master II Series User Manual

Tower type
Hide thumbs Also See for Master II Series:
Table of Contents

Advertisement

3. OPERATION

3-1. Button operation

1)
Before operation, make sure both battery circuits are properly connected with the terminal sequence "
+,GND,-" and the battery pack breaker is in the "ON" position (for long-term models only).
2 ) Press the "
The UPS will enter initialization mode. After initialization, follow the "CONTROL" menu to operate the UPS.
This button only works when the UPS is turned off with the battery connected but without AC input. When
the UPS is connected with the AC network, simply follow the "CONTROL" menu to operate the UPS after
LCD initialization.

3-2. Screen Description

After initialization, the LCD will display the main screen. There are five sub-menus: Control, measure,
settings, information and log data. Touch one of the sub-menu icons to enter the sub-screen.
CONTROL
MEASURE
Initializing
MAIN
SETTING
INFO
DATA LOG
3-2-1. Home screen
When powered on, the LCD will initiate initialization for approximately a few seconds as shown below.
After initialization, the main screen will be displayed as shown below. On the button, there are five icons
representing five sub-menus: Control, measure, setting, information, log data.
" to turn on the power supply for the UPS to turn on the LCD screen.
ON/OFF UPS
BATTERY TEST
MUTE ALL
ON/OFF CHARGER
MEASURE1
MEASURE2
MEASURE3
BASIC1
GENERAL
BASIC2
User
ADVANCE
Maintainer
BASIC INFO
RATED INFO
PARAMETER INFO
Tree menu
ELECTRICAL
BATTERY
MISCELLANEOUS
PASSWORD:0000
SYS PARAMETER
PASSWORD:****
INSTALL INFO
VOL CALI
CURR CALI
INITIAL
ELECTRICAL
BATTERY
MISCELLANEOUS
UPS SELFTEST
8
DATALOG
PARAMETERS
CALIBRATION
EEPROM
TOUCH
96 72.07

Advertisement

Table of Contents
loading

This manual is also suitable for:

Inspire 83310-qsInspire 83320-qs

Table of Contents