Optional Blower; Blower Operation; Mobile Home Installation - Pacific energy ALDERLEA T5 LE Operating And Installation Instructions

Table of Contents

Advertisement

The optional blower kit (kit #WODC.BLOWB) is equipped with a three prong power cord and may be installed
at any time. Follow installation instructions supplied with the kit. Route power supply cord away from heater.
Electrical rating: 115 volts A.C.-1.1 amps.
Fan output rating: 140 CFM

Blower Operation

Proper blower speed matched with air control setting will ensure peak performance from your stove. Operate
as follows:
Air control set to "L" (low), operate blower speed control on "Low".
Air control set between "L" and "H" (low and high), operate blower speed control at desired setting.
Automatic: To operate the blower automatically, set the rocker switch on the side of the fan housing to
"Auto" and set the speed control to desired setting. This will allow the fan to turn on as the stove heats up to
operating temperature. It will also shut the blower off after the re has gone out and the unit cooled to below a
useful heat output range.
Manual: To manually operate the blower, set the rocker switch to "Man" and set the speed control to desired
setting. This will bypass the sensing device and allow full control of the blower. Switching from "Auto" to
"Man" or selecting speed may be done anytime.
These mandatory requirements for installation into a mobile Home, are in addition to those listed under
Residential Installation.
Clearances to combustible surfaces and materials are shown below.
15"
381mm
Figure 11: T5 Minimum clearances - Mobile Home.
100000353

Optional Blower

Mobile Home Installation

Mobile Home - Double Wall Connector only
5"
127mm
14"
356mm
26"
660mm
18"
457mm
4"
102mm
20
4"
102mm
ALT 5-LE 140623-28

Advertisement

Table of Contents
loading

Table of Contents