Firebrick Installation - Pacific energy ALDERLEA T5 LE Operating And Installation Instructions

Table of Contents

Advertisement

A
B
Figure 13: Brick lay out.
Figure 14: Floor of rebox and ash dump.
1. When installing rebricks onto the oor of the unit, 2 small bricks ("A & B" in Figure 13) will used on either
end of the ash dump in addition to the regular sized "D" bricks used in the rest of the installation. There is
one exception. Brick "C" is a shorter brick than "D" bricks are. "C" brick ts up against a vertical post on
the rear wall of the rebox.
ALT5-LE 140623-28

Firebrick Installation

C
D
Figure 15: Firebricks on oor.
23
ITEM DIMENSIONS
A
1 1/2" X 4 1/2" X 1 1/4"
B
4" X 4 1/2" X 1 1/4"
C
7 1/4" X 4 1/2" X 1 1/4"
D
9" X 4 1/2" X 1 1/4"
D
D
B
D
A
PART NUMBER
C
D
D
D
100000353

Advertisement

Table of Contents
loading

Table of Contents