Pacific energy ALDERLEA T5 LE Operating And Installation Instructions page 24

Table of Contents

Advertisement

2. Once the rebricks for the oor have been laid down, the rebricks for the side walls are next. The
sides use "D"sized bricks. The bricks will stand on top of the oor bricks on their ends. Install a brick in
between the tabs and slide it to the back.
D
D
D
D
Figure 16: Left wall bricks in place.
3. The rear wall is last. The rear bricks stand on end and on top of the oor bricks. Angle the brick under the
tab, then push in the bottom of the brick until it rests against the back wall. Repeat for the other 2 bricks.
100000353
D
D
Figure 18: Rear wall rebrick installation
complete.
Figure 17: Bricks on right side wall in place.
D
24
D
D
D
D
ALT 5-LE 140623-28

Advertisement

Table of Contents
loading

Table of Contents