1. Carefully remove wood crating top and supports.
2. Remove plastic cover.
3. Remove the Brick Pack from the rebox. Install Firebricks (see section; Firebrick Installeation) after stove
is in its nal location, and the chimney is installed.
25"
635mm
29 3/4"
756mm
Figure 1: T5 LE Dimensions.
ALT5-LE 140623-28
Assembly
Dimensions
28 3/4"
730mm
11
10 1/8"
257mm
28 1/2"
724mm
100000353