3. Installation of Display Unit Cabinet
After the wall-mounted bracket is installed, follow the steps below to install the cabinet in the bracket:
(1) For the integrated packaging method of flight case, it is required to take out two sets of 3×3
combinations, totaling 18 units of display cabinets.
(2) Install the first group (i.e. box 1-2-3 / 7-8-9 / 13-14-15, 9 cabinets in total) from the left of the first row at
the bottom, and install and fix cabinets in the bracket.
・For a row of cabinets at the bottom, there is need to put hexagon screws into the cabinet through 4
holes on the upper left, lower left, upper right and lower right. For the cabinets located in the middle and
the top, there is need put socket head cap screws into the box through the upper left and upper right
holes, and then install the screws on the T-shaped nut.
Note that the T-shaped nut needs to be placed in the transverse profile frame in advance).
・Place the cabinet on the installed profile frame through the adjusting T-shaped nut.
Note that screws shall not be totally locked.
・Check the flatness of cabinet and the connection status of the front and left sides of cabinet. Adjust the
levelness and verticality, and then lock screws to secure the cabinet to the profile bracket.
Install the cabinets in the second group on the right (i.e. 4-5-6/10-11-12/16-17-18, 9 cabinets in
(3)
total), and fix the cabinets into the brackets.
・For a row of cabinets at the bottom, there is need to put hexagon screws into the cabinet through
4 holes on the upper left, lower left, upper right and lower right. For the cabinets located in the
middle and the top, there is need put socket head cap screws into the box through the upper left
and upper right holes, and then install the screws on the T-shaped nut
・Place the cabinet on the installed profile frame through the adjusting T-shaped nut.
・Use 9 cabinet set screws to fix 3/9/15 cabinets and two sides of 4/10/16 cabinets at the splicing
point of two sets of cabinets on left and right.
・Check the flatness of cabinet and the connection status of the front and left sides of cabinet.
Adjust the levelness and verticality, and then lock screws to secure the cabinet to the profile
bracket.