Hisense HAIO138 User Manual page 30

Table of Contents

Advertisement

Step 4:
Fix the connecting blocks (in another storage box) on the beam with 2 Pcs
direction shown in the figure. Total of 9 connecting blocks and 18 screws are fixed at intervals as shown in the figure.
NOTE:
During the fixing process, the connecting blocks is in a natural drooping state. After fixing, the screw head sinks into
the groove of the connecting blocks, and the upper and lower planes of the connecting blocks should be
basically flush with the upper and lower planes of the beam.
Step 5: Bottom Beam(Media Bar) Assembly
(1)Unpack and check the integrity of components, including two upper front shells, left and right side frame
shells, and a total of five components of the bottom beam(Media Bar)(Including front left cover and front right
cover);
(2)Take out the assembled bottom beam(Media Bar), as shown in the figure, remove the (M3 × 6)*13 PCS
small Philips screw from bottom front edge of control bar. Then remove the two front aluminum covers.
Place rest Bottom Beam(media bar) on cart frame shelf hooks.
M6*15
Install 4 Pcs
hex socket screws with washers through control bar into bottom mounting blocks. Level
and tighten bottom row connecting blocks to frame once control bar is attached to blocks.
M6×15
Screw (M6×16) ×2
Front cover
25
screws according to the
Connecting block
LED All-In-One User Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Haio163

Table of Contents