Preliminary Operations - SAMES KREMLIN AZUR 72C160 Manual

Table of Contents

Advertisement

Disassembly / Reassembly Operation

Preliminary operations

Option
Tools needed
If the pump is equipped with air equipment:
-
turn off the air supply with the valve (1).
Unscrew the air supply hose (2) with a 32 mm spanner,
blocking the air inlet fitting (3) with a 27 mm spanner.
27
32
65

Advertisement

Table of Contents
loading

Table of Contents