Commissioning - SAMES KREMLIN AZUR 72C160 Manual

Table of Contents

Advertisement

Commissioning

9 Commissioning
Pump
Motor
The pumps are tested in our workshops with lubricant.
Prior to start-up, this lubricant must be removed by rinsing with a suitable
solvent.
At the end of the day, rinse with a suitable solvent.
It is advisable to stop the fluid section in the "low inversion" position in
order to prevent the product from catching on the piston rod.
Engines are tested before shipping.
Nevertheless, before coupling the motor to a pump, it is necessary to
operate it under vacuum at a pressure of 1 bar / 14.5 psi maximum for
a few minutes.
52

Advertisement

Table of Contents
loading

Table of Contents