Names Of Each Remote I/O Unit Section - Mitsubishi Electric MELDAS C6 Maintenance Manual

Hide thumbs Also See for MELDAS C6:
Table of Contents

Advertisement

6.2 Names of Each Remote I/O Unit Section

FCUA-DX10
Front view
1
1
2
2
3
3
4
4
(Front)
5
Bottom
6
view
7
(Back)
1 DI-L (machine input signal connector)
2 DS (baud rate changeover switch)
3 CS (station No. changeover switch)
4 DO-L (machine output signal connector)
5 RIO1 (serial connection connector #1)
6 RIO2 (serial connection connector #2)
7 DCIN (24VDC(+) power input connector)
8 DI-R (machine input signal connector)
9 DO-R (machine output signal connector)
10 HANDLE (manual pulse generator signal input connector)
11 AIO (analog signal input/output connector)
6. CONNECTION OF REMOTE I/O UNIT
6.2 Names of Each Remote I/O Unit Section
FCUA-DX11 /FCUA-DX12
Front view
8
3
9
(Front)
5
Bottom
6
view
7
(Back)
Get other manuals https://www.bkmanuals.com
FCUA-DX13
Front view
1
10
2
3
3
4
(Front)
5
Bottom
6
view
7
(Back)
DS
4
3
5
2
6
1
7
CS
0
8
F
9
E
A
D
C
B
Enlarged drawing of DS and CS
I - 56
FCUA-DX14
Front view
1
2
3
4
(Front)
5
Bottom
6
view
7
(Back)
For changeover of baud rate.
Normally set to left side.
Not used
Selection of station No.
11
3

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Meldas c64

Table of Contents