Procedure - Delta M50A-260 Installation And Operation Manual

Solar inverter
Table of Contents

Advertisement

10 Disconnecting the inverter from the power supply before working on it

Procedure

10.2 Procedure
92
1. To shut off the inverter at the grid, open the load-break
switch between the inverter and the grid connection point.
Secure the load-break switch to prevent it from being
switched back on.
2. Turn both DC disconnectores to the OFF position.
3. Wait at least 60 seconds until the internal capacitors have
discharged.
Always use the supplied mounting tools to open
the DC connectors.
When disconnecting the DC cables, take care not
to damage the connectors.
Do not use force.
Pull out at the DC connector, not at the DC cable.
4. Use the mounting tool to release the DC cables and then
pull them out.
Installation and Operation Manual M50A_260 RPI503M260000 Product version L and M EU V1.3 EN 2023-08-14

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rpi503m260000

Table of Contents