Connecting The Grid (Ac); General Information; Handling Aluminum Conductors During Installation Work - Delta M50A-260 Installation And Operation Manual

Solar inverter
Table of Contents

Advertisement

7 Installation

Connecting the grid (AC)

7.8
Connecting the grid (AC)
► Always observe the information in section
"5.4 Planning the grid connection (AC)",
page 37!

7.8.1 General information

180 mm
Fig. 7.8:
Free space for wiring on the AC terminal block
Fig. 7.9:
Torques for AC terminal block
20 mm
20 mm
Fig. 7.10:
Stripping length for AC cables
76
7.8.2 Handling aluminum conductors during
installation work
► The special properties of aluminum must be taken into con-
sideration when using aluminum conductors:
Aluminum "flows," i.e. it gives way under pressure.
A thin non-conductive oxide layer forms within a few
minutes on de-insulation, which increases the contact
resistance between the conductor and clamping point.
The specific conductivity and hence the current carry-
ing capacity is approximately one third less than that of
copper.
NOTICE
To ensure a safe and reliable contact with alumi-
num conductors, always perform the following
work steps:
► Keep the installation location as free
► Connect the aluminum cables quickly.
► Clean the stripped end of the aluminum
Installation and Operation Manual M50A_260 RPI503M260000 Product version L and M EU V1.3 EN 2023-08-14
as possible from moisture or corrosive
atmospheres.
conductor mechanically (for example,
using a knife blade to scrape off the oxide
layer), then immediately dip the aluminum
conductor into acid-fee and alkaline-free (=
neutral) Vaseline and straight away insert it
into the Al-Cu compression joint.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rpi503m260000

Table of Contents