12 Recommissioning the inverter after work
Procedure
146
7. Insert the Allen key into the upper door lock.
8. Plug in the DC cables.
9. Close the isolating switch between the inverter and the
grid connection point or inverter and the solar modules.
10. Turn both DC disconnectores to the ON position.
þ
Recommissioning is complete.