10 Disconnecting the inverter from the power supply before working on it

Procedure

10.2 Procedure
94
1. To shut off the inverter at the grid, open the load-break
switch between the inverter and the grid connection point.
Secure the load-break switch to prevent it from being
switched back on.
2. Turn both DC disconnectores to the OFF position.
3. Wait at least 60 seconds until the internal capacitors have
discharged.
Always use the supplied mounting tools to open
the DC connectors.
When disconnecting the DC cables, take care not
to damage the connectors.
Do not use force.
Pull out at the DC connector, not at the DC cable.
4. Use the mounting tool to release the DC cables and then
pull them out.
Installation and operation manual M70A_260 Flex RPI703M26000 EU V1.1 EN 2022-08-02