Performing The Verification Tests - Agilent Technologies 66311A User Manual

Table of Contents

Advertisement

B - Verification and Calibration
NOTE: Connector
DC
-
Voltmeter
+
NOTE: Connector
-
DC
Ammeter
+
Figure B-1. Verification and Calibration Test Setup

Performing the Verification Tests

NOTE:
The verification procedure can only be performed from the front panel or using the SCPI
language commands. If your unit is set to the COMPatibility programming language, use
either the front panel
programming language to SCPI.
The following procedures assume you understand how to operate the dc source from the front panel as
explained in chapter 5. Also, when performing the verification tests from an HP-IB controller, you may
have to consider the relatively slow settling times and slew rates of the dc source as compared to
computer and system voltmeters. Suitable WAIT statements can be inserted into the test program to give
the dc source time to respond to the test commands.
Perform the following tests for operation verification in the order indicated.
1. Turn-On Checkout
2. Voltage Programming and Measurement Accuracy
3. Current Programming and Measurement Accuracy
124
SENSE
-S
-
+
+S
is removable
+
-
50VDC MAX TO
Remote
Current
monitor
A.
SENSE
-S
-
+
+S
is removable
+
-
50VDC MAX TO
Remote
Load
resistor
400 ohm
+
-
External
C.
DC supply
Address
Local
Remote
NOTE: Connector
is removable
Set to
DC
-
Ammeter
+
Verification Load Resistor
400 ohms
Local
Remote
Calibration Load Resistor
800 ohms
Set to
key or the SYSTem:LANGuage command to change the
SENSE
-S
-
+
+S
Local
Remote
+
-
50VDC MAX TO
Set to
Remote
Load
Resistor
B.

Advertisement

Table of Contents
loading

Table of Contents