Note
It is recommended that before you perform the tests in either Table 2-4 or Table 2-5, that you first locate
the appropriate Performance Test Record sheet from Tables 2-7 through Table 2-11 for your specific
model. Make a copy of this sheet, and record the actual observed values in it while performing the tests.
Use the sheets in Tables 2-7 through Table 2-11 as master reference sheets to run copies at any time.

Operation Verification Tests

Table 2-3 lists the requirements for operation verification, which is a subset of the performance tests.
1
Turn-On Checkout
2
Voltage Programming and Readback Accuracy
3
Current Programming and Readback Accuracy
Record the results of Tests 2 and 3 in the appropriate Performance Test Record sheets.
14 Verification
Figure 2-1. Constant Voltage (CV) Test Setup
Table 2-3. Operation Verification Tests
Test
Refer To
Power Supply Operating Manual
Table 2-4
Table 2-5