Planned Maintenance Tasks - DANIEL 1200 Series User Manual

Liquid turbine meter
Table of Contents

Advertisement

SERIES 1200 LIQUID TURBINE METER
Planned maintenance
September 2020
9.8

Planned maintenance tasks

Table 9-1: Planned maintenance tasks
Task
Inspect
Clean
Monitor corrosion / erosion / wear
80
www.Daniel.com
90
Recommended action
Implement a periodic inspection program to ensure all parts
are free from damage due to process, ambient or other
abnormal conditions.
Internal components: rotor, upstream to downstream
cone, etc.
Meter body housing, external flanges, flamepath.
Bolting
Electrical connections.
Use a non-toxic metal cleaning solvent.
Do not use common petrochemical solvents like Benzene,
Toluene or Xylene as they can pose potential health hazards.
A careful review of turbine meter proving history, such as
turbine meter factor control charts, can reveal potential
problems with turbine meter measurements. Examples
include bearing drag due to wear or an increased internal
cross-sectional area due to erosion.
Daniel Series 1200 Liquid Turbine Meter
User manual
P/N 3-9008-513

Advertisement

Table of Contents
loading

Table of Contents