Prepare the turbine meter for use

4.1

Lifting conditions

CRUSHING HAZARD
During turbine meter installation or removal, always place the unit on a stable platform
or surface that supports its assembled weight.
Failure to comply could allow the turbine meter to roll, resulting in death, serious injury
or equipment damage.
LIFTING HAZARD
The lifting instructions are for installation and removal of the Daniel Liquid Turbine
Meter only and do not address lifting the turbine meter while it is attached or bolted to
piping.
Failure to comply with these instructions may result in death, serious injury, or
equipment damage.
FORKLIFT HAZARD
Do not insert the forks of a forklift into the bore when moving the turbine meter.
Inserting the forks may cause the meter to become unstable, resulting in serious injury
or equipment damage.
Table 4-1: Lifting and installation conditions
Conditions
Lighting and ventilation
Work area clearances and
installation height restrictions
Surface considerations
Soil/floor loadings and
product/piping support
38
www.Daniel.com
User manual
WARNING
WARNING
CAUTION
Description
Install the turbine meter in a well lit and ventilated location, not
less than one meter (approximately three feet) from source of
ignition or source of heat which might damage the unit.
Refer to
maintenance.
Stable surface.
Follow local procedures that meet the standards for soil/floor
loading and product/piping support.
Prepare the turbine meter for use
Minimum clearances for installation, operation and
September 2020
41

Advertisement

Table of Contents
loading

Table of Contents