SERIES 1200 LIQUID TURBINE METER
Planned maintenance
September 2020
2. Install the support fins and nut from the downstream (rotor) end into the internal
3. Gently install the internals into the flow tube.
70
www.Daniel.com
Important
Handle the rotor with care. Improper handling of the rotor assembly may cause
distortion to the rotor blades, affecting meter performance.
Figure 9-27: Internals assembly
bullet.
Figure 9-28: Support fins and nut installation
Figure 9-29: Internals installation