Planned Maintenance Tasks - DANIEL 1500 Series User Manual

Liquid turbine meter
Hide thumbs Also See for 1500 Series:
Table of Contents

Advertisement

User manual
P/N 3-9008-507
4. Disconnect terminal connects at TB1, TB2, and TB3.
5. Loosen screws of preamplifier and lift out.
6. Mount the replacement preamplifier board in its original position and secure using
screws.
7. Attach electrical output wiring from both pickoffs to terminal connection TB2 and
TB3.
8. Attach electrical output wiring from electrical accessories (conduit wiring) to
terminal connection TB1, number 3 for channel A, and number 5 for channel B.
9. Secure all electrical wiring.
10. Secure screws of preamplifier bracket in to the enclosure.
11. Return cover and secure.
9.8

Planned maintenance tasks

Table 9-2: Planned maintenance tasks
Task
Inspect
Clean
Monitor corrosion / erosion / wear
User manual
Recommended action
Implement a periodic inspection program to ensure all parts
are free from damage due to process, ambient or other
abnormal conditions.
Internal components: rotor, upstream to downstream
cone, etc.
Meter body housing, external flanges, flamepath.
Bolting
Electrical connections.
Use a non-toxic metal cleaning solvent.
Do not use common petrochemical solvents like Benzene,
Toluene or Xylene as they can pose potential health hazards.
A careful review of turbine meter proving history, such as
turbine meter factor control charts, can reveal potential
problems with turbine meter measurements. Examples
include bearing drag due to wear or an increased internal
cross-sectional area due to erosion.
USER MANUAL
Planned maintenance
September 2020
97
87
www.Daniel.com