CHAPTER 8 – UNIT START-UP
SECTION 8:

UNIT START-UP

8.1 INITIAL START-UP REQUIREMENTS

Before starting the heater, the user must be correctly instructed by the installer, on how to
operate the heater, in particular:
Make sure that the user understands that combustion air and ventilation openings must
not be restricted, closed, or modified in any way.
Make sure that the user is informed of all the special measures to be taken for
combustion air inlet and discharging flue gases, and that these must not be modified in
any way.
Make sure that the user keeps this manual and all other documentation included with the
heater.
Make sure that the user understands never to tamper with gas control settings and the
risk of CO poisoning should an unauthorized individual do so
Make sure that the user knows how to adjust temperatures and controls.

8.1.1 Filling the Condensate Neutralizer

The condensate neutralizer tank is positioned inside the heater as shown in Figure 4-8. It must
be filled with water to prevent the leakage of flue gases from the condensate drainpipe, item "C"
in Figure 4-8 and Item "E" in Figure 4-9. To fill and inspect the condensate neutralizer, refer to
Section 10.12.
WARNING!
If the unit is turned OFF for more than 3 months, repeat the above operation to again fill the
condensate trap. Failure to follow this warning could result in excessive levels of carbon
monoxide.
OMM-0100_E • GF-146 • 11/15/2019