Sidewall Termination - Concentric Vent - Watts Aerco TAG-0072 GF-146-E Operation & Maintenance Manual

Natural gas and propane gas modulating condensing boilers and water heaters
Table of Contents

Advertisement

AM Series Boiler & Water Heater User Manual
CHAPTER 6: INSTALL – VENT & COMBUSTION AIR PIPING
Figure 6-7: Two-Pipe Multi-Unit Air and Vent Sidewall Termination
6.5.14 Sidewall Termination – Concentric Vent
A concentric vent termination must terminate outside the structure and must be installed
as shown in Figure 6-8. The termination opening must be protected from rain, as shown in
Figure 6-9.
Figure 6-8: Concentric Sidewall Termination Clearances
OMM-0100_E • GF-146 • 11/15/2019
Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST
Page 77 of 170

Advertisement

Table of Contents
loading

Table of Contents