Installing Multiple Vent And Air Vertical Terminations - Watts Aerco TAG-0072 GF-146-E Operation & Maintenance Manual

Natural gas and propane gas modulating condensing boilers and water heaters
Table of Contents

Advertisement

AM Series Boiler & Water Heater User Manual
CHAPTER 6: INSTALL – VENT & COMBUSTION AIR PIPING

6.5.20 Installing Multiple Vent and Air Vertical Terminations

Install multiple vent and air terminations in a roof as follows:
Installing Vertical Multiple Vent and Air Roof Terminations
1.
When terminating multiple units, terminate each vent/air connection as shown in Figure 6-
12.
2.
Place roof penetrations to obtain minimum clearance of 12 inches between edge of air
intake elbow and adjacent vent pipe of another appliance for U.S. installations
3.
The air inlet is part of a direct vent connection. It is not classified as a forced air intake with
regard to spacing from adjacent appliance vents.
Figure 6-12: Installing Multiple Vent and Air Vertical Terminations – Two
OMM-0100_E • GF-146 • 11/15/2019
Alternatives
Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST
Page 82 of 170

Advertisement

Table of Contents
loading

Table of Contents