Commissioning
8.3 Initial commissioning an open controller
Result
• The Windows 10 IoT Enterprise operating system (64-bit LTSC) is installed.
• The "Operator" user is logged on automatically.
• The Software Controller is ready to use.
• For administrative purposes, the "Operator" user can be logged off and the administrator
created during commissioning can be logged on.
• The operating system's start screen is displayed after each startup.
8.3

Initial commissioning an open controller

The following sections provide an overview of the first commissioning of an Open Controller.
Step 1: Creating the configuration of the Open Controller (Page 50)
Step 2: Setting the IP address (Page 51)
Step 3: Changing the properties of the Software Controller (Page 51)
Step 4: Establishing the HMI connection
Step 5: Downloading a project to the target system (Page 51)
Step 6: Transferring the license key (Page 52)
Step 7: Switching the Open Controller on/off (Page 54)
8.3.1

Creating the configuration of the Open Controller

Requirements
The following requirements must be met before you can create the configuration of the Open
Controller:
• TIA Portal ≥ V18 must be installed.
• You have started the TIA Portal and created a new project.
Creating the configuration
To create the configuration in the TIA Portal, follow these steps:
1. Double-click "Add new device" in the project tree.
2. Select "PC systems > SIMATIC S7 Open Controller > ET 200SP Open Controller >".
3. Select the required device.
4. Select the desired version and click "OK".
50
The configured Open Controller is displayed in the device view.
CPU 1515SP PC2 (F/T/TF)
Operating Instructions, 03/2023, A5E42603425-AC