Uncrate The Pd1550A Rack And Safety Enclosure; Tools Required For Uncrating The Pd1550A Rack - Keysight PD1550A System Installation Manual

Advanced dynamic power device analyzer
Table of Contents

Advertisement

PD1550A Double-Pulse Test Rack and Safety Enclosure
Installation Guide
Uncrate the PD1550A Rack and
2
Safety Enclosure
The Double-Pulse Test (DPT) Rack and Safety Enclosure is the largest of the two
shipping container shipped for the system. This chapter describes how to
uncrate the DPT Rack and Safety Enclosure.
In this chapter:

Tools Required for Uncrating the PD1550A Rack

Tools Required for Uncrating the PD1550A Rack
Uncrate the Rack and Safety Enclosure
Moving the Rack and Safety Enclosure
Re-crating the Rack and Safety Enclosure for Shipping
42
To avoid possible injury, at least two people are required to

uncrate the PD1550A Rack and Safety Enclosure.

IMPORTANT: A minimum of 3 meters (9 ft) of clearance is required
all the way around and above the shipping crate to enable
removing of the packing material.
– T40 Torx screwdriver
– Optional: pry bar to remove crate clamps
page 33
page 34
page 41
page
33

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PD1550A and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents