Download Print this page

Nakayama MB9005 Manual page 22

Advertisement

Available languages

Available languages

After maintenance the safety protection guard installment must fix it on the power
ATTENTION:
tiller wholly
Ⅱ. Installation and Adjustment for cable
1. Adjustment of the clutch cable. (See Figure 5 and 6)
① Unscrew the locknut of the tie rod
② Spin the tie rod clockwise until the exposed handle support is the shortest.
③ Get the joint of cable into the clutch wire socket of rear part of the gear-box
assembly, and ensure the joint of cable goes into the hole of the socket.
Figure 5
Figure 6
④ Get the wire into the M8 hole on base of the clutch fork arm, properly press

Advertisement

loading

This manual is also suitable for:

033288