LUNA2000-(97KWH-1H1, 129KWH-2H1,
161KWH-2H1, 200KWH-2H1) Smart String ESS
Maintenance Manual
Figure 8-2 Removing the BAT/BUS terminal cables
Step 3 Remove the J1 and J2 terminals, and the FE network cable.
Figure 8-3 Removing the J1 and J2 terminals, and the FE network cable
Step 4 Remove the short-circuiting copper bars.
Figure 8-4 Removing short-circuiting copper bars (200 kWh model)
Issue 04 (2023-06-30)
Copyright © Huawei Digital Power Technologies Co., Ltd.
8 Replacing a Smart Rack Controller
48