1.2 Electrical Safety

Before connecting cables, ensure that the equipment is intact. Otherwise, electric
shocks or fire may occur.
Non-standard and improper operations may result in fire or electric shocks.
Prevent foreign matter from entering the equipment during operations. Otherwise,
equipment damage, load power derating, power failure, or personal injury may
occur.
For the equipment that needs to be grounded, install the ground cable first when
installing the equipment and remove the ground cable last when removing the
equipment.
Do not route cables near the air intake or exhaust vents of the equipment.
General Requirements
Issue 04 (2023-06-30)
Only authorized professionals are allowed to replace the equipment or
components (including software).
Only personnel who need to work on the equipment are allowed to access
the equipment.
D ANGER
D ANGER
D ANGER
WARNING
CA UTION
Follow the procedures described in the document for installation, operation,
and maintenance. Do not reconstruct or alter the equipment, add
components, or change the installation sequence without permission.
Obtain approval from the national or local electric utility company before
connecting the equipment to the grid.
Observe the power plant safety regulations, such as the operation and work
ticket mechanisms.
Install temporary fences or warning ropes and hang "No Entry" signs around
the operation area to keep unauthorized personnel away from the area.