Step 5 Cut off the cable ties and install the battery pack fixture.
Figure 5-5 Installing the battery pack fixture
Step 6 Remove the nuts from the management module.
● If you do not perform operations as required, the module may be energized
during maintenance, which poses safety risks.
● Use an insulated socket wrench with an extension bar longer than 40 mm.
Figure 5-6 Removing the nuts
Step 7 Remove the 10 screws from the management module and remove the
management module (including the battery pack fixture).
During the operation, prevent screws from falling into the bottom of the ESS.
Issue 04 (2023-06-30)
CA UTION
NO TICE
Copyright © Huawei Digital Power Technologies Co., Ltd.
5 Replacing a Battery Management Module