Follow-up Procedure
Step 1 Turn on AC switch 1FCB1 of the CMU adapter power supply.
Step 2 Turn on DC switches 1Q1 and 1Q2 of the ESS.
Step 3 Log in to the SmartLogger WebUI, CMU WebUI, FusionSolar app, or management
system and check that the communication is normal and that no related alarm is
generated.
Step 4 Log in to the SmartLogger WebUI, CMU WebUI, FusionSolar app, or management
system and send a startup command to the rack controller.
Step 5 Check the running status of the system and ensure that the functions are restored.
Step 6 (Optional) If all configuration files are exported before device replacement, log in
to the CMU WebUI and import the exported configuration files to the new device.
Otherwise, skip this step.
1.
2.
Issue 04 (2023-06-30)
Choose Maintenance > System Maint., and click Import under Full profile
import
NO TE
In the Re-authentication dialog box, enter Password of current user and set
Encryption password of the imported file.
NO TICE
In the CMU replacement scenario, certificate-related files are not exported
among all configuration files. After all configuration files are imported, you
need to reload a third-party certificate if needed.
Figure 18-5 Importing all configuration files
Click Select File, select the exported all configuration files, and then click
Import.