Ash Box And Cover Below The Integral Fuel Hopper - Windhager BIOWIN 2 TOUCH Installation Instructions Manual

Pellet boiler
Hide thumbs Also See for BIOWIN 2 TOUCH:
Table of Contents

Advertisement

For the installer

11.14 Ash box and cover below the integral fuel hopper

If you have not already done so, move the boiler into its final position (observe minimum clearances, see section 11.5
and, using the four set screws, align horizontally or inclined slightly upwards towards the rear – see also section 11.10.
Ash box only for BioWIN 2 Touch Exklusiv/Exklusiv-S:
„ –
Just hook on the ash box base underneath the integral fuel hopper and bend the front part down to the floor
level – Fig. 99.
„ –
Insert the ash box at a slight angle from the left and push in the ash box handle completely, leaving the openings
on the side of the ash box open – Fig. 100.
„ –
Close the bracket fastener – Fig. 101.
„ –
Adjust the ash-box foot (BioWIN 2 Touch Exklusiv/Exklusiv-S only) on the boiler – Fig. 102.
Tip.
The floor underneath the ash box has to be level.
Fig. 99
Just hook on the ash box base.
Fig. 101 Close the ash box fastener
Fig. 100 Insert the ash box at a slight angle from the le and push in the
ash box handle completely
Fig. 102 Adjust the foot
43

Advertisement

Table of Contents
loading

Table of Contents