Taking The Boiler Off The Installation Pallet And Transporting It To Where It Is To Be Installed - Windhager BIOWIN 2 TOUCH Installation Instructions Manual

Pellet boiler
Hide thumbs Also See for BIOWIN 2 TOUCH:
Table of Contents

Advertisement

For the installer
11.2.2 Taking the boiler off the installation pallet and transporting it to where it is to be
installed
a) By hand – Fig. 7–Fig. 10.
b) With a suitable sack truck and ratchet strap – Fig. 11–Fig. 12.
c) with eyelet and crane (not included) – Fig. 13, Fig. 14.
a)
By hand
Fig. 7
Remove side pieces of wooden frame
Fig. 9
Grip position for auger tube and fl ue outlets
b)
With sack truck and ratchet strap
Fig. 11
Secure boiler to sack truck with ratchet strap
Fig. 8
Use planks from crate as ramp
Fig. 10
Move boiler off pallet
Fig. 12
Li boiler off pallet with sack truck
22

Advertisement

Table of Contents
loading

Table of Contents