For the installer
11.9 Integral fuel hopper cladding
only for 236 lb / 107 kg or with automatic pellet feed integral fuel hopper
„ Hook the cladding at the rear left into the bayonet locks – Fig. 63, Fig. 64.
Fig. 63
Bayonet lock
„ If the flue connection is at the top, punch out the cut-out on the cladding at top left – Fig. 65. If the flue connection
is at the rear, do not punch out.
Punch out the cladding = top flue connection
Do not punch out cladding = rear flue connection
CAUTION Material losses
„ Carefully insert or position the cladding, top left, to ensure that the integral fuel hopper is not scratched
at the front – Fig. 66.
Fig. 65
Punch out the cut-out only if the fl ue connection is at
the top
Fig. 64
Remove the adhesive tape from the water tank and
hook on the cladding
Position the cladding carefully at the top le
Fig. 66
35