Installing The Thermocontrol Sensor; Installing The Thermocontrol Sensor Cover - Windhager LogWIN Klassik Assembly Instructions Manual

½ m wood gasification boiler; for small and large houses; nominal thermal output: 18, 25, 30 kw
Hide thumbs Also See for LogWIN Klassik:
Table of Contents

Advertisement

2.
For the Installer

2.4.12 Installing the thermocontrol sensor

– Route the thermocontrol sensor (green cable) at the front of the right side panel down and feed through –
Fig. 28, 29. But first bend the cut-out (feed-through) at the bottom of the side panel out of the way.
– Insert the sensor over the ash door in the front and into the protective tube; hook the spring in place – Fig. 30, 31.
Information!
Pull the protruding cable from the thermocontrol sensor back into the side panel or control panel.
The cable may not hang out in order to keep it from becoming caught in the ash door.
Fig. 28 Inserting the thermocontrol sensor at the top
Fig. 30 Securing the thermocontrol sensor with
spring, pulling cable back

2.4.13 Installing the thermocontrol sensor cover

– Attach the thermocontrol sensor with 4 self-tapping screws – Fig. 32.
2 each of
Fig. 32 Attaching the cover over the thermocontrol sensor with 4 screws
Fig. 29 Threading through thermocontrol
sensor
Fig. 31 Thermocontrol sensor with spring
18
Cut-out feed-
through
2 each of

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents