TECHNICAL SPECIFICATIONS
TIMING DIAGRAMS
Turning On sequence
Marking control signals behavior
REF. NAME
T1
T2
T3
T4
T5
T6
34
UNIQ™
Figure 24: Turning On sequence timing diagram
T1
T2
Figure 25: Marking process timing diagram
DESCRIPTION
Minimum time duration that the START_MARKING signal must have
Start Time
in order to be accepted as a valid START_MARKING event
Delay between the acceptance of the START_MARKING signal and the
Start Delay
rising edge of the BUSY signal
Delay between the rising edge of the BUSY signal and the laser emis-
Busy Advance
sion
Minimum time duration that the STOP_MARKING signal must have in
Stop Time
order to be accepted as a valid STOP_MARKING event
Delay between the end of the laser emission and the falling edge of
Busy Delay
the BUSY signal
End Time
Time duration of the END signal
NOTE: Consult Lighter™ software user's manual for a proper use of the
same.
user defined
within ~200 ms
user defined
typ. 60s
T3
500 ms
T4
T5
T6