Art DTRACK3 User Manual page 70

Table of Contents

Advertisement

8 Menu Hardware - Hardware configuration
refreshes the list.
Mark the desired controller by left-clicking and press 'Select' to assign this controller to
the cascaded system. It will then appear on the left-hand side of the dialog in the list of
the 'Selected' controllers. Repeat these steps if you want to add more slave controllers
to the cascade.
To remove controllers from the cascaded system simply select the corresponding con-
trollers in the list of the 'Selected' controllers by left-clicking and press button 'Deselect'.
You can also enter a
cific static IP address. Please refer to chapter 5.3 on page 36 for more information.
The checkbox
'wake on
controllers (not available for
cade will take 3-4 minutes as the master has to boot up first and then wake up the slave(s).
The changes will be accepted by the system by pressing
tensity, sync groups) of all cameras inside the cascade can now be edited through the
Hardware
Cameras
you start the measurement all cameras inside the cascade can be accessed through the
Monitor 2DOF display
In case of using the
slave controllers will acquire their IP addresses automatically.
By default all controllers are set up to support DHCP. When building
cascades via LAN the controllers will acquire an IP address automati-
cally given that a DHCP server is running.
If any slave controller is not connected via an ethernet cable or
no DHCP server is running, it will use a fall-back IP address (IP
192.168.0.1, subnet mask 255.255.255.0) and you will not able to con-
nect to your slave controllers !
If the cascade is connected via the
ART Controller
to a specific static IP address in the subnet 172.29.xxx.xxx with subnet
mask 255.255.0.0. Do not use IP addresses in the range from 172.29.0.1
to 172.29.0.20 ! Please refer to chapter 5.3 on page 36.
Shutdown of master and slave controller(s) is always synchronized.
Tick the option
automatically.
Before starting a measurement, please double-check whether a BNC
connection for synchronisation has been established between master
ART Controller
Do not use the PoE injector nor the BNC synchronisation when
connecting
trollers.
70
'slave hostname or IP
LAN' enables synchronized start-up of the master and all slave
SMARTTRACK3
dialog. Proceed with configuration of your setup. The next time
.
ART Synccard3
or
ART Controller/M
'wake on
LAN' to also start-up the slave controller(s)
'OUT1' or
ART Controller/M 'OUT
SMARTTRACK3
address' directly in case you have set a spe-
&
SMARTTRACK3/M
'OK
or internal camera network all
'Cascaded network
, all slave controllers must be set
&
SMARTTRACK3/M
). Starting of the cas-
'. Settings (e.g. flash in-
port' of the
' and slave(s) 'EXT.In'.
slaves to
ART
Con-

Advertisement

Table of Contents
loading

This manual is also suitable for:

ArttrackTrackpackSmarttrackDtrack

Table of Contents