Chapter 3 Maintenance; Introduction; Scheduled Maintenance - ENCAD NovaJet 800 Series Service Manual

Table of Contents

Advertisement

Maintenance

Introduction

This chapter contains general maintenance and cleaning instructions for
the NovaJet 800 series printers.

Scheduled Maintenance

Scheduled maintenance consists of a list of checks that are planned to
be performed on a regular basis or when conditions warrant it.
Scheduled maintenance can be thought of as preventive maintenance
since its purpose is to prolong the life of the printer. It is not intended to
repair or isolate an existing problem, though it can sometimes be helpful
in detecting a condition due to a weakened component that has not yet
completely failed.
Below is a list of scheduled maintenance checks and their recom-
mended periodicity.
Clean external areas:
Clean slide shaft:
Clean service station:
Clean encoder strip:
Clean trailing cables:
Clean platen surface/vacuum holes:
Clean cartridge dimples:
Clean flex cable contacts:
Clean and inspect motor gears:
Clean and inspect Main PWA:
Clean and inspect carriage assembly:
Clean dryer assembly
Reseat connectors on Main PWA:
Reseat connectors on carriage boards:
Replace trailing cables
Replace carriage cover bushings (2 total):every 2000 plot hours
Replace carriage bushings (4 total)
weekly, or as required
weekly
daily
weekly
bi-weekly
monthly
if prime fails
if prime fails, or cartridge
is replaced
annually
annually
annually
monthly
annually
annually
every 2000 plot hours
every 4000 plot hours
3
3-1

Advertisement

Table of Contents
loading

Table of Contents