Tick after
No.
completion
12
13
Annex 2: System Turn OFF Progress List
Tick after
No.
completion
1
2
3
The first installation should do full charging progress.
After Master controller has communicated with each
slave BMS, it will run parallel operation. It will begin from
lowest voltage battery string to do the parallel operation
during the charging.
If the status LED of BMS turns to green, it means this
battery string is in parallel operation.
If the system need black start, long press the start button 30
seconds after power on. System will close relays and output for
10 minutes.
Soft-off the PCS through PCS's control panel.
Turn off the switch between PCS and this battery string
(PowerCube-H1/H2-V2), or turn off the power switch of PCS, to
make sure no current through this battery string.
Turn off all the "Power Switch" of the Control Module.
Item
Item
42 / 42
Remark
The first
installation
should do full
charging
progress.
Refer to chapter
3.7
Remark
Refer to chapter 3.8
Refer to chapter 3.8
Refer to chapter 3.8
Need help?
Do you have a question about the PowerCube-H1-V2 and is the answer not in the manual?