Result; Conducting The Final Evacuation; Refrigerant Charging - York YVAA Installation Operation & Maintenance

Air-cooled screw liquid chillers, air-cooled screw liquid chillers with variable speed drive
Table of Contents

Advertisement

SECTION 9 - MAINTENANCE
8. If the vacuum does not hold for within the lim-
its defined in Step 6, you must find and repair the
leak. For cases where leaks cannot be identified
while pressurized but vacuum hold tests indicate
that there is a leak, in most cases this can be traced
to an elastomeric or O-ring sealing issue.

Result

When the 5,000 μm vacuum hold test is successful,
you can perform a final evacuation.

Conducting the final evacuation

After the pressure test and vessel dehydration have
been completed, conduct the final evacuation as fol-
lows:
1. Connect a high capacity vacuum pump with in-
dicator, to the system charging valve as shown in
Figure 27.
2. Ensure all the system valves including manual
valves and EEVs are 100% open. Make sure that
all valves to the atmosphere are closed with flare
caps in place, if applicable.
3. Operate the vacuum pump to evacuate the system
to the best attainable vacuum. The vacuum must
be less than 500 μm, but if that cannot be attained,
a vacuum at 1000 μm or lower is acceptable.
4. To start the 8 hour vacuum hold test, close the
system charging valve connection to the vacuum
pump. Note the time and pressure.
5. Hold the vacuum obtained in Step 4 in the sys-
tem for 8 hours. Any rise that exceeds the limits in
Step 7 can indicate a leak, the presence of mois-
ture, or both. It is important to check for pressure
change with the chiller at the same temperature.
Pressure changes proportional to temperature and
affects results.
6. To determine if it is moisture or a leak, conduct
a pressure rise test. Evacuate the system to 5,000
μm again and perform another hold test.
• If the pressure rise goes to 0 psig, it indicates
that a leak is present.
• During the hold period, if moisture is pres-
ent, the pressure stabilizes at some level be-
low atmosphere and must correspond to the
room ambient temperature or the heat being
applied to the vessel. See see Table 28 on
page 166 for values.
168
7. An acceptable vacuum pressure rise is 150 μm in
60 minutes.
8. If the vacuum does not hold within the limits de-
fined in Step 7, you must find and repair the leak.
For cases where leaks cannot be identified while
pressurized but vacuum hold tests indicate that
there is a leak, in most cases this can be traced to
an elastomeric or O-ring sealing issue.
Result
When the 500 μm hold test is successful, you can
charge the system using the steps in Refrigerant charg-
ing.

Refrigerant charging

Before beginning, it is critical to establish that the vapor
portion of the refrigerant container or cylinder has not
been contaminated with other gases that are not R-134a
or R-513A as required, including air. Use the appropri-
ate saturation property for the correct refrigerant. See
Table 29 on page 169 and Table 30 on page 170 for
R-134a and R-513A respectively, to determine if the
saturation pressure and ambient temperature of the re-
frigerant in the container indicates that the gas pressure
coincides with the corresponding temperature.
To prevent liquid freezing within any of the chiller
tubes when charging an evacuated system, make sure
that only the refrigerant vapor from the top of the drum
or cylinder is admitted to the system until the system
pressure is raised above the corresponding saturation
pressure at the freezing point of the chilled liquids. For
all other liquids, establish the freeze point temperature
and vapor charge to an appropriate pressure that is 5°F
(2.78°C) higher than that freeze point. For water with
R-134a at 32°F, that pressure is 28 psig. See Table 29
on page 169 and Table 30 on page 170.
Form 201.47-ICOM1
Issue date: 17/11/2022
JOHNSON CONTROLS

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents