Daily operation
Figure 53, printer Test ticket
Maintenance
7
This chapter primarily describes maintenance activities. How often these
activities need to be carried out depends, to a large extent, on the conditions of
the area where the ticket terminals have been installed. The thermal head, for
instance, must be cleaned more frequently if the surrounding air contains a high
concentration of diesel exhaust fumes.
Note:
Spare part numbers can be found on the exploded view drawings of each
models.
Issue 5
CWT S5 Installation & Maintenance Manual
Page 61
Need help?
Do you have a question about the CWT S5 and is the answer not in the manual?
Questions and answers