Electro-Voice X-LINE ADVANCE Series Installation Manual page 64

Table of Contents

Advertisement

64
en | Flying the system
14. Pull and twist the four captive twist lock pins (D).
15. Lift the column of enclosures (E).
16. Lower the array to a convenient working height above the floor.
17. Repeat steps 3-14 until all elements of the array are landed on dollies.
18. Install the X12-125F-DOLLY top cover for transportation. See X12-125F-DOLLY top cover,
Notice!
i
Three X12-125F subwoofers in cardioid configuration may be landed and transported on the
dolly as a single block.
Removing the grid
Caution!
The extended grid sidearms are heavy and likely to tip if not secured, potentially causing
!
damage and/or personal injury if one should fall.
Always maintain a good grip on the sidearm until both twist-lock pins are fully engaged.
To remove the grid, do the following:
1.
2.
3.
4.
2019-07 | 04 | F.01U.310.953
Verify the pin is thoroughly pushed in and thorough both sides of the rail.
D
E
D
D
C
C
All four captive twist lock pins now are in the unlock position.
A single column of two elements is on the dolly.
page 26
Remove the 5/8-inch shackle from the spreader bar(s).
Lift hoist motor to a safe height.
Remove spreader bar.
Pull and twist the four captive twist lock pins.
All four captive twist lock pins now are in the unlock position.
D
C
Installation manual
X-LINE ADVANCE System Rigging & Transport
Electro-Voice

Advertisement

Table of Contents
loading

Table of Contents