X-LINE ADVANCE System Rigging & Transport
5.
6.
7.
8.
9.
10. Make sure all hooks, pins, shackles, and other associated rigging components are
11. Lift column of enclosures (C).
12. Turn the X12T-DOLLY around.
13. Roll the dolly out from under the lifted column.
14. Set the inter-box splay angles according to line array configuration software instructions.
15. Pull and twist the four captive twist lock pins on the top element of the next column of
16. Land the flown column on top of the next column.
17. Twist the four captive twist lock pins to engage.
18. Repeat steps 9-17 until the array is complete.
Adjusting the splay angles
Use the report from the line array configuration software to set the angles to build the array.
The angle between elements is set on the element above. If using compression, the unused
quick-release pins should be placed in the PIN PARK holes. If using a two-pin fixed hang, lift
the bottom rear of each successive element starting from the bottom until it hits the stop at
the selected angle.
Electro-Voice
Make sure the pins are engaged in the closed position. Illustration shows the X12TC-GRID
(left), the X12TE-GRID (center), and the X12-125F-GRID (right).
C
A
A
A
B
B
B
B
X12
TC GRID &
-
X12T-DOLLY
Repeat steps 2-4 on the opposite side.
The grid should now be attached to the column of enclosures.
Install one spreader bar between the side arms in the appropriate hole as determined by
the line array configuration software.
OR
If using two spreader bars, install one spreader bar at hole #1 and install one spreader
bar at hole #33.
Attach a 5/8-inch shackle(s) to the pick point on the spreader bar(s).
Make sure the shackle is rated for overhead lifting.
Attach the hoist chain hook to the shackle.
Disengage all four dolly pins (B) from the bottom rigging on the column to be lifted.
properly positioned and secure before lifting the array.
If choosing to aim by the compression method, install the upper portion of the pull-up
grid kit at this time.
enclosures to add to the array.
Make sure all pins are engaged in the closed position.
C
A
A
B
B
B
X12
TE GRID &
-
X12T-DOLLY
Installation manual
Flying the system | en