X-LINE ADVANCE System Rigging & Transport
X12-125F-DOLLY:
To land an X12-125F array onto an X12-125F-DOLLY, do the following:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10. Position the empty dolly under the array.
11. Ensure grilles are positioned on the front side of the dolly.
12. Lower the array until the link bars engage the V-blocks on the dolly.
13. Insert the four dolly pins (C) to lock the enclosures onto the dolly.
Electro-Voice
Lower the array (A) to a convenient working height above the floor.
If single pin compression method was used, carefully reverse the hoist and uncompress
the back of the array so the hoist has no tension and all of the elements in the array have
returned to the 0° position.
OR
If double pin method was used, lift up slightly on the rear of each of the bottom two
elements and remove the quick-release pins from the lock holes. Gravity will cause the
unlocked rigging splay to revert to 0° position.
If single, pin compression method was used, remove the bottom grid side arms.
On the bottom element, select 4° ( ) in the Angle Select section on both sides.
Lift the link bars until they stop.
Lock the link bars in place at 4° by pinning them in the 0°/Even hole of the Angle Lock
section.
Pin the two elements above at 0° on each side.
Disengage the four dolly pins (B) on the dolly base.
All four dolly pins are disengaged and hanging from the dolly.
A
B
B
B
Verify the V-blocks are unobstructed and clear.
The X12-125F-DOLLY is designed for the X12-125F sub to be placed with the grilles
positioned on the front side of the dolly.
Guide the array to land the link bars onto the dolly rails.
B