Placement Of The Enterprise Storage - GDC Standalone IMB SR-1000 Installation Manual

Standalone integrated media block
Table of Contents

Advertisement

3.CONNECTING PORTABLE STORAGE/ENTERPRISE STORAGE WITH THE SR-1000

3.2.1. Placement of the Enterprise Storage

It is recommended that the Enterprise Storage unit should be placed on the projector pedestal
as illustrated in Figure 12, such that the eSATA cable length (provided with the package) is
sufficient enough to establish the connection between the IMB & Enterprise Storage.
Please ensure that the eSATA cable is not bent sharply or stressed.
GDC SR-1000 STANDALONE INTEGRATED MEDIA BLOCK™
INSTALLATION MANUAL
Figure 12: Enterprise Storage Placement
- 15 -
nd
December 22
, 2022

Advertisement

Table of Contents
loading

Table of Contents