Installation Of Ripper Assembly - Komatsu D155A-6 Assembly Instruction Manual

Bulldozer
Hide thumbs Also See for D155A-6:
Table of Contents

Advertisement

Assembly process No.
A-6
a The giant ripper is used as a model in this assembly manual. The multi-shank ripper is different from
the giant ripper only in the following parts.
1) Weight of ripper assembly
2) Number of shanks: 3
3) Pin puller cylinder and piping for it are not necessary.
1. Slinging ripper assembly (by 3 points)
Install shackles to beam (1 place) and arm (2 places) and install wires to them.
4 Weight of ripper assembly
Giant: 2.9 ton
Multi-shank: 2.5 ton
Precautions
Be sure to put wooden blocks between the arm and beam to pre-
vent their relative positions from changing when they are slung.
Wooden blocks
Arm

Installation of ripper assembly (1/7)

Slinging position: Beam (1 place)
Shackle: BC36
Beam
Necessary tools
Name
ø12 × 2 m wire
Shackle SD22
Shackle BC36
1.5 t lever block
Other remarks
32
Shackle: SD22 (2 pieces)
Slinging position: Arm (2 places)
Necessary equipment
Q'ty
Name
3
25 t crane
2
100 mm wooden block
1
1
Q'ty
1
2

Advertisement

Table of Contents
loading

Table of Contents