Komatsu D155A-6 Assembly Instruction Manual page 41

Bulldozer
Hide thumbs Also See for D155A-6:
Table of Contents

Advertisement

Assembly process No.
A-6
6. Installation of lift cylinder
1) While slinging cylinder (6), extend it gradu-
ally to set the pin hole.
4 Lift cylinder: 188 kg
2) Insert pin (7) and fix it with the lock plate.
Part No. of bolt
Part No. of washer
Length of bolt
Socket to be used
Tightening torque
Precautions
Installation of ripper assembly (5/7)
01011 – 82040 (2 pieces)
01643 – 32060
40 mm
30 mm
456 – 568.8 Nm
{46.5 – 58 kgm}
Necessary tools
Name
Nylon sling
KW20P impact wrench
M30 socket
Sledge hammer (10P)
Bar
Other remarks
36
6
7
Necessary equipment
Q'ty
Name
1
25 t crane
1
1
1
1
Q'ty
1

Advertisement

Table of Contents
loading

Table of Contents