Assembly process No.
S-1
6. Removal of covers
(1) Remove the B-pillar cover.
•
Remove bolts (AB) in the cap of handle (AB) (1 pieces each on the right and left sides) and
remove handle (AB).
a At this time, collar (Z) comes off, too. Take care not to drop it.
•
Remove bolt (Y) and B-pillar covers (U) and (V).
a At this time, collar (W) and washer (X) come off, too. Take care not to drop them.
(2) Remove the C-pillar cover.
•
Remove screws (AF) (2 pieces each on the right and left sides), clips (AD), and C-pillar
cover (AC).
U
V
AB
AA
Precautions
Take care not to lose the removed parts since they will
be installed again after the cab and floor are connected.
Installation of operator's cab (7/16)
AF
Y
X
W
AC
Z
AD
Fig. 6 B-pillar cover
Necessary tools
Name
Other remarks
56
AE
Necessary equipment
Q'ty
Name
Q'ty